A track record built quietly on live Central London sites, alongside developers, principal contractors and specialist subcontractors.
Standards ELLNO helps you achieve.
From gap analysis to evidence packs and audit readiness. Support to reach the certifications tier-one contractors and public bodies pre-qualify against.
Every borough has its own rulebook.
The documents are public. The judgement, the sequencing and the relationships that turn them into consented works aren't. These are the four Central London authorities I spend most of my time in.




Aligned with the industry bodies that set the standard.
Continuing professional development in sustainable resource management and environmental assessment.
Consents secured, stakeholders aligned, programme protected.
Most Central London projects lose time to the same three failure modes: consents that miss their window, community objections that escalate to environmental health, and mitigation strategies that don't hold up once the site is live. Each ELLNO engagement is scoped to close one of those exposures before it costs you programme.
Consents secured first cycle
Section 61 applications and Construction Logistics Plans prepared to the standard local authorities expect, negotiated through to determination without resubmission.
Stakeholders managed proactively
Structured engagement with residents, occupiers and ward members ahead of works, so concerns are resolved in dialogue rather than through formal complaint channels.
Assurance your client can rely on
Independent monitoring and reporting written to a standard that stands up to board-level, planning authority and third-party scrutiny without rework.
Seven practice areas, built around Central London constraints.
Each one solves a specific failure mode. Combine them or pick the one you need.
Strategic advisory
Independent judgement before you commit.
Local authority approvals
The paper that lets the work actually start.
Environmental, sustainability & carbon
BREEAM, PAS 2080 and ISO 14001 without the theatre.
Neighbourhood liaison
Get the neighbours before they get you.
Preconstruction services
Independent eyes before and during the loud phases.
Environmental noise, vibration & dust monitoring
Real-time numbers, defensible evidence.
Accreditations support
The standards clients now ask for at PQQ.
Central London sites, delivered to programme.
South Molton Street.
Construction advisory on a heritage-sensitive scheme in the heart of Mayfair, with pedestrian flow, neighbouring tenants and consents held under continuous scrutiny.
ELLNO turned a Section 61 that had been sitting with the borough for three months into a signed consent in a fortnight. The difference was framing, not acoustics.
Advisory work across Westminster, Camden, Kensington & Chelsea and the Square Mile.
Outline the site.
Every enquiry is reviewed by the Principal Consultant and answered within 48 hours. Live-site matters are prioritised the same day.









